by [email protected] | Jan 31, 2022
The Home Depot – Somerville MA Water Main Replacement Project: Utility Upgrades – Water Main Replacement Home Depot, 75 Mystic Ave Somerville, Somerville MA This project consisted of the removal of the existing 10” Water Main and replacement...
by [email protected] | Apr 2, 2021
MACOM Headquarters – Lowell This project consisted of a major 60,000 SF addition to MACOM’s Headquarters in Lowell. We worked with our client, Integrated Builders, to design pedestrian & traffic management plans because the existing HQ was fully operational...
by [email protected] | Apr 1, 2021
Overlook Ridge – Malden This was a 3 part project for Capitol. Phase 1 consisted of 2,000 FT of roadway construction with 35,000 CY of blasting/ledge removal. Phase 2 consisted of site development for 360 unit apartment complex with over 5,110 FT of Water/ Sewer/...
by [email protected] | Apr 1, 2021
Alliance Broadstone – Billerica This project consisted of a new mixed residential building with 211 units. We had close coordination with our client, Erland Construction, and MASS DOT in order to perform work within the Right of Way. SOE walls along the roadway were...
by [email protected] | Apr 1, 2021
Avalon Eaves Quincy This project consisted of a very intricate water main replacement project for Avalon Bay at their property in Quincy. Capitol needed to work closely with the Town of Quincy to isolate sections of the existing water main loop to the property. The...
Recent Comments